Home (CZ) | PL | SK | DE | EN | RU
Aktuality
Video
Reference
We are very satisfied with the result. The design is already showing that short, efficient assembly time will be absolutely feasible. We ascertained these results not just in theory but very vividly with a 3P (Production Preparation Process) workshop. The design’s good momentum will also flow into a follow-up project.
Elmar Stichlmair, Consultant Engineering Assembly Civil Programmes, MTU Aero Engines

Kontakt

ROI Management Consulting a.s.

Belnická 603
252 42 Jesenice u Prahy
Czech Republic


T:  +420 241 413 853
F:  +420 239 017 359
M: +420 602 168 905


info@roi-international.cz